This is the report at the moment. I have tried to put together the part 1 and structure the overall contents, reusing as much as I could the work I have done so far and adapted to the guidelines. At the moment I am progressing with the drawings and modelling of the scheme and still need to add the drawings to part 1.
No comments:
Post a Comment